Sports Event

 

1. Providing equipment shipping services for a famous Chinese sports brand to sponsor Swedish Olympic athletes to participate in 2010 Vancouver Winter Olympic Games

 

In line with Olympic logistic requirements, Realogistics needed to formulate a complete shipping plan, including:

1) Preparing shipping bills - meeting the related custom regulations of the country hosting the Olympic Games;

2) Exterior package design;

3) Exterior package - Shipping Mark design;

4) Predicting possible accidents and abnormal situation and providing contingency plan;

5) Confirming import custom procedure in the country hosting the Olympic Games;

6) Complying to logistic regulations and restrictions required by the country hosting the Olympic Games, such as:

7) Formulating accurate Olympic logistic shipping schedule, ensuring delivery on time while minimizing extra storage.

 

In October 2009, Realogistics launched the preparation works four months before the Olympic Games started. By reference to “National Olympic Committee Customs and Freight Guide”, we carried out comprehensive surveys and offered solutions for each item. Finally, we successfully completed Olympic logistic shipping tasks for our key client.

 

Project date: November 2009-February 2010

 

ImageImage

 

 

 

 

 

2. Realogistics assisting a key client to sponsor Swedish athletes to participate in the 2012 London Olympic Games - material shipping project specification 

 

 

 

ImageImage

 

 

 

1. Pre-shipping preparation

 

1) Tariff exemption policy for sponsored Olympic cargos; 

2) The requirements of safety and package by UPS - the designated logistic provider of the London Olympic Games

3) According to the cargo movement in UK, calculated shipping time from the ports to designated Olympic venues and specific requirements.

4) The geographic information of Olympic village, the information related to destination and Olympic venues, critical points of Olympic logistics, such as key information (bump-in and lockdown) and arrangement. 

 

Image

 

2. Actual logistic operation plan

 

1) Domestic cargo tally:

2) The requirements and implementation of custom and quarantine and inspection administration:

 

Custom requirements at the departure port: In addition to normal custom regulations, different custom regions had their respective requirements. Thus, Realogistics selected different ports according to cargo features. For example, sponsored goods are “other tariff-free goods”. We shipped such goods to Tianjin port.

The requirements of quarantine and inspection administration at the departure port: For inspected cargos, the quarantine and inspection administration would issue the commodity inspection certificates or export goods manifests for each type of cargos. Realogistics staff would reclassified cargos and ensure cargos in line with certificates, so as to smooth the inspection by the quarantine and inspection administration and save time.

Destination: Custom requirements: textile cargos normally had many requirements. Working with this supplier, Realogistics had accumulated extensive experience. Before shipping, we would confirm the import requirements with the destination port.

3) Actual operation and shipping:

4) Custom clearance and delivery in foreign countries

5) Personalized emergency service:

 

In either China or overseas, Realogistics always flexibly provided the most effective and fastest solutions in line with customer and cargo requirements.

Around 6 p.m., the night of Thursday on July 19, 2012, Realogistics received the order from the client to deliver cargoes emergently. Due to the high operational pressure on Friday and the shortage of time, Realogistics decided to pick up goods immediately and book shipping space, then confirmed letter of authorization and requirements. All works were finished within 30 minutes while the operation team got ready. And then we delivered goods at 11 p.m. and saved time for custom clearance. With the approaching of the Olympic Games, all flights to London were booked. So we selected a transit routes, rather than normal inland truck shipping routes in Europe after making a comprehensive risk assessment. All routes were shipped by airplanes, so as to ensure goods were delivered on the weekend. Custom clearance started on July 23 (Monday) London time by the logistic provider designated by the London Olympic Committee. Due to different destinations, Realogistics confirmed sub-package plan with clients. The shipping mark was prepared and the agency was noticed of new cargo distribution standards. Finally, cargos were accurately delivered to the destination.

Shipping destination map: cargo sorting shipping mark

 

ImageImage

 

Finally, Realogistics successfully completed this Olympic shipping task and highly recognized by the client.

 

Project date: June 2012-July 2012 

 

 

 

 

 

 

 

 

 

 

 

 

Exthibition and Performing

 

 

1. Guaranteed shipping solution for Hubei troupe to perform in Singapore

 

The following solutions were proposed:

1) The traditional route from Wuhan to Singapore or from Shanghai to Singapore by sea was infeasible due to the shortage of time. Based on this, Realogistics innovatively suggested a new route, namely shipping containers to Shenzhen by trucks and then to Singapore by sea. As Shenzhen located in the South of China, it saved 4-5 days to ship goods to Singapore compared to departing from the Port of Shanghai. This route could meet client’s time requirement.

2) Realogistics clearly knew that the custom clearance was very strict at southern ports. Therefore, we lodged a written application to Shenzhen port custom in advance and obtained the permission. All goods were claimed under the name of “performance props”.

3) After obtained ATA carnet, Realogistis timely scanned the carnet to our Singaporean agency and asked the agent to prepare materials with performance party so as to answer the enquiry of Singaporean custom about the item name.

4) Our Singaporean agency inspected the shipping route at the theatre in advance. Upon the inspection, the theatre had no space for unloading containers. Finally, we decided to unload goods at a warehouse and then shipped to the theatre by small trucks.

Finally, the performance was successfully held as the client wished. In this order, we provided an economical shipping route and saved huge costs (compared to air freight), while ensuring quality in each shipping section. Client was very satisfied.

 

Image

 

2. Guaranteed shipping solution for China-India cultural exchange exhibition

 

Requested by the Ministry of Culture, Shaanxi Provincial Department of Culture held a grand Shaanxi folk culture exhibition and performance in Delhi, India. With our colleagues in Xi’an, Realogistics provided a comprehensive solution for the Department of Culture, including:

 

Considering storage insecurity in Indian warehouses, we stored goods in Chinese embassy temporarily after custom clearance. At the end of performance, flights to Xi’an were cancelled due to China National Day holiday. However, our client needed these goods for other performance. So, we worked with a Japanese airline to ship the cargo back to Xi’an during the holiday and arranged custom clearance immediately.

 

Generally, the delivery services in some developing countries, such as India, would encountered a series of problems, such as unclear custom clearance procedure, inefficient custom services, incomplete supporting facilities and slow information feedback. This was a state-to-state cultural event, involved in Ministry of Culture, P. R. China, Shaanxi Provincial Department of Culture, and Chinese embassy in India. Under the joint efforts with Indian agents, we successfully completed this important shipping task.

 

3. Logistic service for an international leading crystal brand holding a product launch ceremony in Beijing

 

On October 2012, Realogistics provided logistic service for an internationally leading crystal brand to hold an exhibition exclusive for professional audiences in Beijing. The cargos imported from UK were all expensive, while the shipping time was limited. Realogistics provided a fast logistic solution described as follows:

 

1) All products were shipped from UK to exhibit in Beijing and then shipped to Hong Kong, while some products were shipped to Singapore. Apart from exhibits shipping from the UK, some products were hire purchased. Based on this complex situation, Realogistics prepared different ATA carnets in line with different products with British agency and hire purchased products were processed in China as general import cargo.

2) The exhibition had many storage places, including Shanghai airport supervision warehouse (the 1st import place), Beijing exhibition venue, temporary warehouse at Beijing airport, Shanghai import warehouse, Hong Kong airport warehouse and Hong Kong exhibition warehouse. Realogistics purchased carrier liability insurance and property insurance, ensuring insurance coverage at all warehouses.

3) This exhibition was for professional audiences. Realogistics provided custom clearance route for Shanghai exhibition so that the client could successfully hold the exhibition in China. Professional logistic design was also needed.

4) Exhibits were branded import cargos, so brand authorization was needed. Realogistics suggested the client to employ a Shanghai-registered company to import as general goods, solving brand authorization issue.

5) As the time of custom clearance in Shanghai is limited, we worked with British agency and Shanghai client to complete ATA and general cargo custom clearance for complex cargos in a short period of time. For shipping from Shanghai to Beijing, the client accepted the suggestion of Realogistics and selected truck-load rather than airfreight. Cargos were safely and timely delivered to the exhibition site.

 

Image

 

Image

 

The two key parts (cargo delivery for exhibition arrangement and move-out) at Beijing exhibition were described as follows:

 

1. Key points of cargo delivery for exhibition arrangement:

Exhibition venue: Beijing Central International Trade Center.

The following problems were met and solved at the entry and exit of exhibition hall:

 

1) Inspected the site in advance;

2) Confirmed cargo delivery principle with the client ;

3) Confirmed the time of cargo picking up and delivery;

4) Others:

 

Because we shared the cargo lift with other clients during the moving-in and out period, we asked the client to coordinate with related offices on this issue so as to ensure the entry-exit priority and reduce waiting time.

 

Image
Image

 

1. Key points of move-out exhibition:

 

1) Confirmed the custom declaration agency and operation agency and asked the price.

2) Express delivery of ATA carnets.

1st: Posted to SHA custom declaration agency.

2nd: Informed Shanghai Realogistics when we finished custom claim and posted ATA carnet to the destination agency (ATA carnet could not be reissued if lost because the cargos were expansive).

3) Confirmed price: Including Beijing ground fee, domestic shipping fee, Shanghai ground custom declaration fee, operation cost, international shipping fee and DDU cost at the destination port.

4) Sorting cargos: Asked the agency to sort out cargos in line with ATA carnet;

5) Packaging and shipping mark: Original import airway bill number was not clear. So we prepared shipping mark (including ID, destination port, and foreign consignee information for our Shanghai colleagues). Shipping marks were properly placed on the boxes (fragile mark faced up). The client was responsible for packing. Otherwise, we would send staff to pack and avoided damage.

6) Handover to fleet: Took photos before and after loading and unloading. If any problem occurred, we would ask the client to inspect damage and affix the responsibility of road shipping company.

7) Confirmed details with foreign agency:

8) Confirmed flight schedule:

We firstly confirmed the time arrived at UK, Hong Kong and Singapore with the client and then booked the shipping space.

 

Image
Image 

 

As the designated logistic agency for this exhibition held in Beijing and Hong Kong, we endeavor to overcome all the problems caused by the time limit and the large number of exhibits. We provided the most convenient solution for our clients in the shortest time, and cargos were successfully delivered to the exhibition venue and shipped back to different destinations after the exhibition. Our work was highly recognized by the client’s headquarters.

 

Project date: October 2012